Tamboran has commenced stimulation activities at the Shenandoah South 1H (SS-1H) well pad within its 38.75 per cent owned and operated EP 117 permit.
The program, which is planned to include 10 stimulation stages over a 500-metre (1,640-foot),horizontal section within the Mid-Velkerri B Shale, is expected to be completed in December.
The campaign is being conducted by Condor Energy Services.
On completion of the stimulation campaign, production tubing will be installed ahead of the...